Skip to content

Industrial Shed Manufacturers in Morbi: PEB for Ceramic and Tile Plants

Project Stories11 min readDSI Engineering Team

Industrial Shed Manufacturers in Morbi: PEB for Ceramic and Tile Plants

Morbi is India’s ceramic capital, and its tile, sanitaryware and allied plants are almost all pre-engineered steel sheds. A ceramic plant is a hard building: roller kilns over a hundred metres long throw heat into the roof all day, spray dryer towers need height, presses and glaze lines need cranes and a clean floor, and raw material, glaze and finished tiles need storage that can be extended. The right industrial shed manufacturer for Morbi designs each hall for its process, ventilates the heat, keeps dust off the structure and builds for the next expansion. Darshan Steel Infrastructure fabricates at Chhattar on the Rajkot–Morbi highway, a short drive from the cluster, and has delivered plants at Morbi for Lemit Paper, Ambani Paper, Tileque Surfaces, Sicer, Honey Bunny, Slogan Polyfilm and Actionware.

A grid of glazed ceramic tiles in orange, teal, cream and grey, the product that Morbi’s plants fire and pack by the million

Morbi builds its plants in steel

Morbi makes the bulk of India’s ceramic tiles and a large share of its sanitaryware, and it exports to over a hundred countries. The cluster runs along the Rajkot–Morbi and Morbi–Halvad highways and into Wankaner and Kandla, and it has been built almost entirely in pre-engineered steel: long sheds a hundred and fifty to three hundred metres long, forty to seventy metres wide, laid out in parallel so that raw material comes in one end and packed tiles leave the other. Steel won because the halls are long, the process is hot, the plant must be running within months of the land being bought, and the next line is always being planned.

That has also made Morbi a buyer’s market for industrial shed manufacturers, and the sheds are not all equal. A ceramic plant that was quoted as a warehouse will have a roof too hot to work under, purlins full of clay dust, a frame too light for the crane the press line needed a year later and a column where the second kiln should go. This article is about what a ceramic or tile plant shed in Morbi should be, and how to choose who builds it.

The anatomy of a ceramic plant shed

A tile plant is one process laid out in a line, and each stage asks something different of the building over it. The table sets them out. In practice most plants are two or three parallel PEB sheds with different frame types, heights and accessories, connected by canopies and conveyors, rather than one uniform building.

What each section of a ceramic or tile plant asks of its shed
SectionWhat happens thereWhat the shed needs
Raw material and body preparationClay, feldspar and additives are stored, batched, ball-milled and sent to the spray dryerA high, wide store with truck access and a floor for loaders; dust-tolerant structure; heavy ball mill foundations separate from the frame
Spray dryerSlip is dried to powder in a tall tower with a hot gas generatorHeight, often 20 m or more over the tower; a frame or a frame-and-roof-system around the tower; heat and exhaust through the roof
Pressing and dryingHydraulic presses form the tiles, dryers set themEOT cranes for die and mould changes; clean, hard floor; machine foundations isolated from the frame; good light
Glazing and decorationGlaze lines, digital printers, screen and roller applicationA clean, dust-controlled, well-lit hall; consistent temperature; insulation; services on the frame
KilnRoller kilns 100–200 m long fire the tiles at over 1,100 °CA long hall with ridge ventilation along its full length, insulation, stacks through the roof, heat-rated roof details and a frame kept out of the heat
Sorting and packingTiles are checked, graded, packed and palletisedClear floor, daylight, dock doors, canopies
Finished goodsPallets stored and dispatched by truck and containerHigh-bay warehouse with clear height for racking or stacking, wide doors, container yard
What each section of a ceramic or tile plant asks of its shed

Designing for the heat of a kiln hall

A roller kiln runs continuously at over 1,100 °C, and its casing, its exhaust and the tiles leaving it heat the air above it all day. Without a plan that heat gathers under the roof, makes the hall unbearable, bakes the sheeting and its coating and shortens the life of everything up there. The plan is in the accessories: ridge ventilators or a continuous ridge vent along the full length of the kiln, turbo ventilators where the heat concentrates, louvers along the upper walls to draw cool air in, insulation under the sheeting to keep radiant heat off the floor and the kiln’s stacks flashed through the roof with heat-rated details. Daylight panels cut the lighting load but must be placed away from the hottest zones.

A turbo ventilator on the ridge of a red metal roof of a building under construction, with an exhaust unit beside it
A turbo ventilator on the ridge of a new roof: a kiln hall exhausts its heat continuously, and the ventilation has to run the length of the kiln, not sit in one bay.

The frame itself should be kept out of the heat. Columns are set back from the kiln casing, the kiln sits on its own foundation, and the roof is high enough over it that the steel is not in the hottest air. In a well-designed kiln hall the eave is higher than a warehouse of the same width would need, and that height is the cheapest heat protection the building has.

Designing for clay and glaze dust

Body preparation, pressing and glazing produce fine dust that settles on every horizontal surface, including the top flanges of the purlins and girts and the ledges of the frame. Over years it adds weight, holds moisture against the steel and falls onto the product. A ceramic plant shed is detailed to shed it: purlins and girts oriented and spaced so the dust does not sit, sealed laps and flashings, smooth internal cladding or a liner panel in the glazing hall, and a cladding that can be washed down. The frame should be painted for a dusty, sometimes damp interior rather than a dry warehouse, and the design should allow for the dust load on the roof.

Cranes, solar and the loads a tile plant adds

The press hall needs EOT cranes for die and mould changes and maintenance, and the finished goods store may need them for pallets. Cranes are the heaviest load most PEBs carry, and a crane added to a frame that was not designed for it means new columns and new foundations. State the crane capacity, span and duty at the start; DSI frames carry EOT cranes to 50 MT on column brackets. The roof of a tile plant is also one of the largest in the district and, in Morbi, almost always gets solar panels: design the purlins and the frame for the panel load from the first day. Add the spray dryer platforms, the conveyors between sheds, the exhaust ducts and the glaze line services as loads on the structure, not as things hung from it later.

A double-girder EOT crane on its crane beams inside a DSI building, the kind of crane a ceramic or tile plant uses for moulds, dies and packed pallets
A double-girder EOT crane on its crane beams inside a DSI building. In a press hall the crane decides the column, the bracket and the foundation; it has to be in the design from the start.

Building for the next kiln line

Almost every plant in Morbi has added a line, a kiln or a warehouse since it opened, and the plants that did it cheaply were the ones that planned for it. Plan the second shed on the first site plan. Design the endwall that will be opened as a future interior frame. Put the bracing where it can stay. Run the drainage away from the expansion side. Use a multi-span frame type where a second parallel hall will share a column line, and a clear span frame where the floor must stay open. Bolted PEB connections make all of this non-destructive; the design makes it cheap.

Choosing an industrial shed manufacturer for Morbi

Morbi has many companies offering sheds, from integrated PEB manufacturers to fabricators with a yard and a welding set. For a ceramic plant, judge them on five things.

  1. 01The works: a factory with CNC cutting, automatic welding, shot blasting, painting and roll-forming lines, which you have visited. A ceramic plant is too large to be fabricated in a yard.
  2. 02Ceramic plants on the record: buildings in Morbi you can drive past and owners you can call about the heat, the dust, the cranes and the handover date.
  3. 03Engineering for the process: a design basis that names the kiln, the spray dryer height, the crane capacity, the solar load and the dust load, not a rate per square foot.
  4. 04Accessories as part of the design: ventilation, insulation, louvers, daylight and heat-rated roof details specified with the frame.
  5. 05Distance: a works close to Morbi dispatches in phases, replaces a damaged member in hours and sends an engineer the same day.

DSI in Morbi

Darshan Steel Infrastructure fabricates at Chhattar on the Rajkot–Morbi highway, a short drive from the cluster, in a 15,000 sq m works with 15,000 MT a year of capacity. The company has delivered seven plants at Morbi on the public record: paper mills for Lemit Paper (19,920 sq m) and Ambani Paper (10,490 sq m), the Tileque Surfaces decorative surfaces plant (11,850 sq m), the Honey Bunny hygiene products plant (12,990 sq m), the Slogan Polyfilm BOPP film plant (8,940 sq m), a chemical plant for Sicer Italian Ceramic Surfaces (4,150 sq m) and the Actionware home appliance plant (2,550 sq m). Frames are engineered in-house to the Indian codes, cut from 345 MPa plate, shot-blasted and painted for the interior, and roofed in S550 colour-coated sheeting; frames clear 50 m and carry cranes to 50 MT. Management systems are certified by TÜV SÜD to ISO 9001, 14001 and 45001.

FAQ

Questions people ask.

Short answers to the questions this article raises. For the building itself, see About PEB.

Who are the industrial shed manufacturers in Morbi?
Morbi is served by PEB manufacturers along the Rajkot–Morbi highway and across Saurashtra, as well as local fabricators. Darshan Steel Infrastructure fabricates at Chhattar on the highway and has delivered seven plants in Morbi. For a ceramic plant, choose a manufacturer with its own works, ceramic plants on its record and a design basis that names the kiln, cranes and loads.
What type of shed is used for a ceramic tile factory?
Long pre-engineered steel sheds, usually two or three in parallel: a high raw material and spray dryer section, a press and glaze hall with EOT cranes, a long kiln hall with continuous ridge ventilation and insulation, and a high-bay finished goods warehouse. Each section has its own frame type, height and accessories.
How is a kiln hall kept cool?
With a high eave, ridge or turbo ventilators along the full length of the kiln, louvers along the upper walls, insulation under the sheeting, heat-rated flashings where the stacks pass through the roof, and columns set back from the kiln casing so the frame stays out of the hottest air.
Can a PEB carry the cranes a tile plant needs?
Yes, if they are designed in from the start. DSI frames carry EOT cranes to 50 MT on column brackets. State the capacity, span and duty of every crane at the brief; adding one later means new columns and foundations.
Can a ceramic plant shed carry rooftop solar?
Yes, and in Morbi it usually does. The purlins and frame should be designed for the panel load from the first day; adding panels to a roof designed without them needs a structural check and often strengthening.
How long does a ceramic plant shed take to build?
A standard building is typically ready in three to four months and a large plant in five to six, with design and foundations running together. DSI designs, details, fabricates and ships a standard building in under six weeks from approved drawings, and Morbi is a short drive from the works.
What has DSI built in Morbi?
Paper mills for Lemit Paper and Ambani Paper, the Tileque Surfaces decorative surfaces plant, the Honey Bunny hygiene products plant, the Slogan Polyfilm BOPP film plant, a chemical plant for Sicer Italian Ceramic Surfaces and the Actionware home appliance plant, from 2,550 to 19,920 sq m.

More articles

All articles

Next step

Compare the two for your own building.

Plot size, use and target date are enough for DSI to propose a frame and a first sizing, with the cost and the programme against conventional construction.